Energy Code Studies

Real energy code studies from multifamily projects. A feasibility study runs early and compares compliance paths to find the lowest-cost way to build. A VE study runs later and cuts cost out of a design that is already set, without changing design intent.

  • CS78 Energy Code Feasibility Study, Multifamily, Northbridge, Massachusetts (320 units)
  • CS77 Energy Code Feasibility Study, Multifamily, Cockeysville, Maryland (114 units)
  • CS76 Energy Code Feasibility Study, Multifamily, Northbridge, Massachusetts (105 units)
  • CS75 Energy Code Feasibility Study, Multifamily, Provincetown, Massachusetts (16 units)
  • CS74 Energy Code Feasibility Study, Multifamily, Lowell, Massachusetts (4 units)
  • CS73 Energy Code Feasibility Study, Multifamily, Andover, Massachusetts (432 units)
  • CS72 Energy Code Feasibility Study, Multifamily, Andover, Massachusetts (165 units)
  • CS71 Energy Code Feasibility Study, Multifamily, Newburyport, Massachusetts (92 units)
  • CS70 Energy Code Feasibility Study, Multifamily, Shrewsbury, Massachusetts (36 units)
  • CS69 Energy Code Feasibility Study, Multifamily, Provincetown, Massachusetts (16 units)
  • CS68 Energy Code Feasibility Study, Multifamily, Cromwell, Connecticut (267 units)
  • CS67 Energy Code Feasibility Study, Multifamily, Shrewsbury, Massachusetts (250 units)
  • CS66 Energy Code Feasibility Study, Multifamily, Lowell, Massachusetts (205 units)
  • CS65 Energy Code Feasibility Study, Multifamily, South Boston, Massachusetts (17 units)
  • CS64 Energy Code Feasibility Study, Multifamily, Revere, Massachusetts (21 units)
  • CS63 Energy Code Feasibility Study, Multifamily, Lawrence, Massachusetts (24 units)
  • CS62 Energy Code Feasibility Study, Multifamily, Boston, Massachusetts (6 units)
  • CS61 Energy Code Feasibility Study, Mid-Rise Multifamily, Bellingham, Massachusetts (800 units)
  • CS60 Energy Code Feasibility Study, Multifamily, Revere, Massachusetts (30 units)
  • CS59 Energy Code Feasibility Study, Townhome Units, Dorchester, Massachusetts (6 units)
  • CS58 Energy Code Feasibility Study, Low-Rise Multifamily, Lexington, Massachusetts (31 units)
  • CS57 Energy Code Feasibility Study, Seven-story mixed-use, Revere, Massachusetts (112 units)
  • CS56 Energy Code Feasibility Study, Multifamily High-rise, Revere, Massachusetts (144 units)
  • CS55 Energy Code Feasibility Study, Multifamily Mid-rise, Revere, Massachusetts (12 units)
  • CS54 Energy Code Feasibility Study, Multifamily Mid-rise, Quincy, Massachusetts (100 units)
  • CS53 Energy Code Feasibility Study, Townhome Units, Worcester, Massachusetts (170 units)
  • CS52 Energy Code Feasibility Study, Low-rise apartments, North Windham, Connecticut (200 units)
  • CS51 Energy Code Feasibility Study, Multifamily Luxury Apartments (5-Story), Westford, Massachusetts (530 units)
  • CS50 Energy Code Feasibility Study, 3 Story Multifamily Building, Shrewsbury, Massachusetts (36 units)
  • CS49 Energy Code Feasibility Study, 3 Story Multifamily Building Over Underground Podium Parking, Lexington, Massachusetts (40 units)
  • CS48 Energy Code Feasibility Study, Low-Rise & Mid-Rise Multifamily Buildings, Shrewsbury, Massachusetts (213 units)
  • CS47 Energy Code Feasibility Study, 4-Story Multifamily Building Over Slab-on-Grade, Worcester, Massachusetts (57 units)
  • CS46 Energy Code Feasibility Study, Various Low-Rise & High-Rise Multifamily Buildings, Amesbury, Massachusetts (296 units)
  • CS45 Energy Code Feasibility Study, Apartments, Braintree, Massachusetts (325 units)
  • CS44 Energy Code Feasibility Study, 4-Story Multifamily Building, Worcester, Massachusetts (57 units)
  • CS43 Energy Code Feasibility Study, Townhome Units, Worcester, Massachusetts (170 units)
  • CS42 Energy Code Feasibility Study, 4-Story Multifamily Building Over Basement Common Area., Odenton, Maryland (80 units)
  • CS41 Energy Code Feasibility Study, 6-Story Multifamily Building | 6 residential stories with ground level parking., Westborough, Massachusetts (206 units)
  • CS40 Energy Code Feasibility Study, Multifamily, Boston, Massachusetts (21 units)
  • CS39 Energy Code Feasibility Study, 6-Story Multifamily Building | 6 residential stories with ground level parking., Westborough, Massachusetts (206 units)
  • CS38 Energy Code Feasibility Study, 5-Story Multifamily Building | 4-story residential over a parking podium., Lexington, Massachusetts (50 units)
  • CS37 Energy Code Feasibility Study, Multifamily, Boston, Massachusetts (2 units)
  • CS36 Energy Code Feasibility Study, 6-Story Multifamily Building | 5-story residential over a parking podium., Worcester, Massachusetts (276 units)
  • CS35 Energy Code Feasibility Study, 6-Story Multifamily Building | 5-story residential over a parking podium., Boston, Massachusetts (276 units)
  • CS34 Energy Code Feasibility Study, 6-Story Multifamily Building | 5-story residential over a parking podium., Medford, Massachusetts (276 units)
  • CS32 Energy Code Feasibility Study, 5-Story Multifamily Building | 4 residential stories over a podium., Brockton, Massachusetts (46 units)
  • CS30 Energy Code Feasibility Study, 4-Story Multifamily Building (x4) | 4 residential stories with a separate clubhouse., Middleborough, Massachusetts (272 units)
  • CS29 Energy Code Feasibility Study, 5-Story Building | 4 Residential stories over a podium., Framingham, Massachusetts (46 units)
  • CS28 Energy Code Feasibility Study, 5-Story Building | 4 Residential stories over a podium., Framingham, Massachusetts (46 units)
  • CS27 Energy Code Feasibility Study, 2-Story Townhomes with basements., Millis, Massachusetts (28 units)
  • CS25 Energy Code Feasibility Study, Multifamily, Walpole, Massachusetts (95 units)
  • CS24 Energy Code Feasibility Study, Multifamily, Everett, Massachusetts (5 units)