CS85 Energy Code Feasibility Study in Worcester, Massachusetts
Energy code feasibility study for a 74-unit high-rise in Massachusetts. Compares multiple design paths. Recommended: HERS (All-Electric). View full study.
- Study Type
- Energy Code Feasibility Study
- State
- Massachusetts
- Units
- 74
- Building Type
- high-rise
- Fuel Type
- All-Electric
- Recommended Path
- HERS (All-Electric)
Goal
To find the most cost-effective compliance path, this report isolates energy code related costs from total construction. We use real bid data from vendors & clients to create a reliable framework for aligning incentives and design, with all recommendations confirmed by detailed energy modeling.
Project
- Worcester, MA 01609
- 1 Building | 74 Units | 48,565 SF Conditioned
- New Construction | 5-story high-rise multifamily (x1)
- All-Electric | 2021 IECC with MA Amendments (Specialized Opt-In Code) | HERS ≤ 45 OR PHIUS Core 2024 | ENERGY STAR MFNC v1.2 | Indoor airPLUS v2 (optional) | DOE Efficient New Homes (optional)
Overview
Read This: This report compares different ways you can build the project and meet energy code, looking at both cost and incentives, with the ultimate goal as finding the most affordable path.
- The overview outlines the key differences between each of the paths we show in this report and why we recommend the one we picked over the others.
- The recommended design section is where we share the requirements and incentives for the path we think is best based on affordability.
- The path comparison section shows the detailed requirements and incentives for each path we compared, basically showing our work if you want to dig in.
Product Recs: All product recommendations are recommendations only and can be substituted with any equivalent or better match.
Path Summaries
Both paths are modeled to comply, the HERS path on a lean margin and the PHIUS path as a passing Passive House design. The dollars below are energy-related costs, not the whole building budget. The study recommends the less expensive HERS path even where Worcester's Specialized Opt-In requires the Passive House path for this five-story building.
HERS (All-Electric): Recommended
This is the least expensive path in energy-related cost, at approximately $65.65/sf net, and it is the more builder-friendly of the two, with the air barrier on the sheathing. It stays fully electric, which aligns with the direction Massachusetts energy code is heading, and it gives up about $2,000 per unit in energy-related incentives by taking the ENERGY STAR high-rise incentive instead of the Passive House tier. For this project, this is the right choice.
PHIUS (All-Electric): Not Recommended
At approximately $67.99/sf net in energy-related cost, this path costs about $2/sf more than the HERS path after incentives and about $264,000 more in energy-related cost before incentives, so it remains the more expensive design. The premium is mostly windows, walls with continuous insulation, and whole-building air sealing, which also makes it the more labor-intensive build. The only reason to choose it is that Worcester's Specialized Opt-In requires the Passive House path for this five-story building.
What Changes Between Paths
Item | PHIUS | HERS (Recommended) |
|---|---|---|
Exterior Walls | ≥ R-21 cavity insulation (2x6 @ 16" o.c.) with ≥ R-12.6 continuous exterior insulation. | ≥ R-23 cavity insulation (2x6 @ 16" o.c.), no continuous insulation. |
Slab | ≥ R-10 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-10 under-slab insulation; provides a full thermal break. | ≥ R-15 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-15 under-slab insulation, 2 ft wide; provides a full thermal break. |
Rim Joists | ≥ R-34 rim/band insulation at floor transitions. | ≥ R-23 rim/band insulation at floor transitions. |
Windows & Glass Doors | High performance, U ≤ 0.18 / SHGC ≤ 0.18. | High performance, U ≤ 0.25 / SHGC ≤ 0.25. |
Air Sealing | Whole-building blower door test at or below 0.06 CFM50 per sq ft of gross enclosure, and unit compartmentalization at ≤ 0.30 CFM50 per sq ft of shell area; tested. | ≤ 0.30 CFM50 per sq ft of shell area; tested. |
Cost $/sf | $72.59 | $67.15 |
Incentive $/sf | $5.71 | $2.67 |
Net $/sf | $67.99 | $65.65 |
Code Path
- HERS: Worcester is a Specialized Opt-In Code town. The buildings are 5-story Group R under 225 CMR 23, and the dwelling units comply by per-unit HERS under section C407.4. The all-electric Specialized Opt-In ceiling is HERS ≤ 45 (Table C407.4, new construction column). Section C407.4.1 requires the building to meet ENERGY STAR Multifamily New Construction.
- PHIUS Core 2024: Worcester Specialized Opt-In Code. The building is five stories and 48,565 sf of R-2 multifamily, so 225 CMR 23 governs and Appendix CC Table CC101.2 requires the Passive House path of section C407.3 (the C401.2.1 prescriptive and performance paths are N/A for R-2 over 12,000 sf). The all-electric building complies through section C401.2.2 item 1, Passive House Compliance, which requires sections C401.3, C402.3, C405, C407.3 and C408, by certifying to Phius CORE 2024 (section C407.3.1). Phius design certification and final certification replace the HERS route of section C407.4, so there is no HERS ceiling.
Permit Requirements
- HERS: With the building permit application, per 225 CMR 23 section C407.4.2.1: the proposed HERS Index on the title page and plans, the rater's name, the software name and version, all modeled inputs, and a certificate showing each dwelling unit type at or below the Table C407.4 ceiling, with the component specifications behind it (insulation R-values and U-factors, assumed duct and envelope leakage, and heating, cooling, ventilation, and water-heating types and efficiencies), on the worst-case orientation where no site-specific report is produced. ENERGY STAR Multifamily New Construction design review by the rater is part of that package (C407.4.1).
- PHIUS Core 2024: With the building permit application, per 225 CMR 23 section C407.3.2.1 item 1: the Phius Design Certification Letter, issued once Phius design review of the WUFI Passive model, drawings and specifications is complete (Phius 2024 Certification Guidebook sections 1.1.4 and 1.1.5). Where that letter is not yet issued: the Passive House Verification report showing Phius CORE 2024 compliance, a statement from the CPHC that the report matches the permit plans, and evidence of Phius project registration. The construction documents show the EV-ready spaces (C405.13.2) and the solar-ready zone (Appendix CB) per section C103.2 items 14 and 15.
Certificate of Occupancy Requirements
- HERS: Before certificate of occupancy, per 225 CMR 23 section C407.4.2.2: the final HERS Index on the title page and plans, a confirmed as-built HERS certificate for each rated unit with the duct and envelope air-leakage test results and the installed equipment efficiencies, and documentation that each unit meets ENERGY STAR Multifamily New Construction (item 7). C405.13 EV-ready and Appendix CB solar-ready compliance close out with it (item 9). A certified HERS rater verifies the package (C407.4.3). Air-leakage testing follows ANSI/RESNET/ICC 380, and RESNET sampling is permitted because each building has more than 8 units (C402.5.2.2).
- PHIUS Core 2024: Before the final certificate of occupancy, per 225 CMR 23 section C407.3.2.1 item 2: the Phius Final Certification Letter (Guidebook sections 1.1.6 and 1.1.7); or the Design Certification Letter with the as-built Passive House Verification report and its blower door and ventilation results, the CPHC hygrothermal statement, the Phius Verifier statement and the Phius workbook of test results. Field verification follows Guidebook section 1.5.2: mid-construction inspections, a final whole-building blower door test at or below 0.06 CFM50 per sq ft of gross enclosure (Table 1.3.3.2.0), dwelling-unit compartmentalization at or below 0.30 CFM50 per sq ft of enclosure, and ventilation airflow testing and balancing. C405.13 EV-ready and Appendix CB solar-ready compliance is verified at the same time (C407.3.2.1 item 2f).
Recommended Design
This section outlines the design requirements, product recommendations, and incentives for the design that we believe will be the most affordable path to meeting energy code.
Recommended Design - Incentives
Incentives Available: $129,500 - $240,500
- MassSave Multifamily High Rise Program Energy Star Tier ($129,500) (Program Breakdown): You get this rebate for having your building(s) certified for the Energy Star MFNC v1.2 program. This requires pre-approval via an application to be submitted before construction starts. This rebate comes in the form of a check within 4 months of certification documentation being provided to MassSave, typically this is 4 months after construction is complete.
- DOER Alternative Energy Credits ($0 - $111,000) (Program Breakdown): This rebate is received for installing APS eligible air source heat pumps (click here for the list). There is an extensive process to get this incentive. It comes in the form of a check approximately 6-12 months after the heat pumps are installed and fully operational.
- IMPORTANT: Although an estimate is provided, this incentive can vary widely typically between $300-1,500 per heat pump. It's based on expected kWh usage of the system as well as the market value of the alternative energy credits when sold.
- Risks: Massachusetts is rewriting this program right now. The House bill would stop the state from accepting new applications on January 1, 2028, the Senate version leaves heat pumps out of that cutoff, and the two are in conference. The application needs the equipment installed and operating, so a project that will not reach that point before the deadline should treat this as upside rather than a budgeted line.
HVAC Design Loads
Worcester County, MA · heating -2.0°F/70.0°F · cooling 90.0°F/75.0°F · all values kBtuh
Design heat loss · components
Unit type | Walls & rim joists | Roof / ceiling | Slab, floors & below grade | Windows & doors | Infiltration | Ventilation | Design heat loss | Design heat loss at selection |
|---|---|---|---|---|---|---|---|---|
1-Bedroom | 2.3 | 0.8 | 0.0 | 1.4 | 3.8 | 2.3 | 10.6 @ -2°F | 10.6 @ -2°F |
2-Bedroom | 2.8 | 0.0 | 3.6 | 3.5 | 5.5 | 3.1 | 18.5 @ -2°F | 18.5 @ -2°F |
Design heat gain · components
Unit type | Solar through glazing | Envelope conduction | Internal gains | Infiltration & ventilation | Latent | Total heat gain | Sensible heat ratio |
|---|---|---|---|---|---|---|---|
1-Bedroom | 1.5 | 0.9 | 2.1 | 1.9 | 2.8 | 9.3 | 0.69 |
2-Bedroom | 2.8 | 1.6 | 2.3 | 2.8 | 4.1 | 13.6 | 0.70 |
Selection
Unit type | Cooling Capacity | Minimum Heating Capacity |
|---|---|---|
1-Bedroom | 8.4 to 20.0 kBtuh rated | ≥ 10.6 kBtuh @ -2°F |
2-Bedroom | 12.2 to 20.0 kBtuh rated | ≥ 18.5 kBtuh @ -2°F |
ENERGY STAR Total UA
Item | Detail |
|---|---|
Climate zone | IECC 5A (2021 IECC map) |
Program | ENERGY STAR MFNC National v1.2 Rev. 05 |
Rule | Design Review Item 2.1 / Fn 11-12; Proposed UA ≤ Reference UA |
Code reference | Exhibit 1 Table 1 (2021 IECC CZ); Design Review Item 2.1 / Fn 11-12 |
Version basis | explicit program key (v1.2) |
Note | Code minimum for this permit is v1.1; v1.2 used for explicit program key (v1.2). Confirm certification path matches the incentive or AHJ requirement. Reference wall U is 2021 IECC Table C402.1.4 Group R, wood framed and other (U-0.051 in this zone). v1.2 Table 2, ERI commercial option, uses that column for a 4-story-or-taller building. Footnote 12.i (U-0.064 in Climate Zone 5) applies only when the reference is the 2009 IECC commercial chapter, so it is not used on v1.2. Proposed U for walls, roof, windows, doors is the area-weighted Ekotrope assembly U. Any component without an Ekotrope U keeps the spec lookup. Slab F-factor is 0.45, Charles 2026-10-22. |
Assembly | Proposed spec |
|---|---|
Walls | ≥ R-23 cavity insulation (2x6 @ 16" o.c.), no continuous insulation. |
Roof | Sealed attic: ≥ R-30 insulation + ≥ R-30 continuous insulation. |
Windows | High performance, U ≤ 0.25 / SHGC ≤ 0.25. |
Doors | Opaque door, U ≤ 0.20 (R-5.0). |
Slab | ≥ R-15 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-15 under-slab insulation, 2 ft wide; provides a full thermal break. |
Envelope Takeoffs
Building | Opaque walls (sf) | Roof (sf) | Windows (sf) | Slab perimeter (lf) |
|---|---|---|---|---|
1 | 26,657 | 10,430 | 5,682 | 1,086 |
Component UA
Component | Quantity | Proposed U or F | Proposed UA | Reference U or F | Reference UA |
|---|---|---|---|---|---|
Opaque exterior walls | 26,657 sf | 0.057 | 1,524 | 0.051 | 1,359 |
Roof / ceiling | 10,430 sf | 0.017 | 172 | 0.024 | 250 |
Windows & glass doors | 5,682 sf | 0.250 | 1,420 | 0.270 | 1,534 |
Slab edge (F x perimeter) | 1,086 lf | 0.450 | 489 | 0.480 | 521 |
Total UA
Building | Proposed UA | Reference UA | % of reference | Result |
|---|---|---|---|---|
1 | 3,606 | 3,665 | 98.4% | PASS |
Site total | 3,606 | 3,665 | 98.4% | PASS |
Recommended Design - Units
Item | Detailed Specifications |
|---|---|
Exterior Walls | ≥ R-23 cavity insulation (2x6 @ 16" o.c.), no continuous insulation. |
Below Grade Walls | N/A |
Corridor Walls | N/A |
Slab | ≥ R-15 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-15 under-slab insulation, 2 ft wide; provides a full thermal break. |
Floor Over Unconditioned Space | N/A |
Floor Over Garage | N/A |
Floor Over Podium | N/A |
Rim Joists | ≥ R-23 rim/band insulation at floor transitions. |
Roof | Sealed attic: ≥ R-30 insulation + ≥ R-30 continuous insulation. |
Windows & Glass Doors | High performance, U ≤ 0.25 / SHGC ≤ 0.25. (Product Rec). |
Doors | Opaque door, U ≤ 0.20 (R-5.0). |
Air Sealing | ≤ 0.30 CFM50 per sq ft of shell area; tested. (Air Sealing Protocol) |
HVAC | Ducted air-source heat pump (as modeled); SEER2 ≥ 17; HSPF2 ≥ 10. See HVAC Design Loads. (Product Rec). |
Ductwork | Supply and return ducts in conditioned space insulated to code minimum. |
Duct Sealing | ≤ greater of 80 CFM25 or 8 CFM25 per 100 sqft of conditioned floor area; tested at final. (Duct Sealing Protocol) |
HVAC Grading | Fan Flow Test: Grade II |
Mechanical Ventilation | In-unit ERV (Product Rec). |
Local Mechanical Exhaust | The in-unit ERV fulfills local mechanical exhaust with 25 CFM in each bathroom and 50 CFM in the kitchen. |
Thermostats | Programmable thermostat (as modeled). |
DHW | 1-Bedroom: Heat pump water heater (HPWH) (as modeled); UEF ≥ 3.88; 40 gal (Product Rec). |
DHW Piping | Supply piping insulated to ≥ R-3. |
Water Fixtures | WaterSense certified (Lavatory ≤ 1.2 GPM; Shower ≤ 2.0 GPM; Kitchen ≤ 2.2 GPM). |
Refrigerator | ≤ 600 kWh/yr; electric. (Product Rec). |
Dishwasher | ≤ 269 kWh/yr; electric. (Product Rec). |
Clothes Washer | IMEF ≥ 2.06; IWF ≤ 4.2; ≤ 152 kWh/yr; electric. (Product Rec). |
Clothes Dryer | Heat pump dryer; ventless; CEF ≥ 6. (Product Rec). |
Stove / Oven | Electric induction cooktop; convection oven. (Product Rec). |
Lighting | ≥ 100% high-efficacy (LED). |
Solar Ready | Reserve at least 40 percent of the roof as a solar-ready zone, kept clear of vents and equipment and shown on the drawings. Design the roof for an extra 5 psf and leave a pathway to the electrical service. A heavily shaded roof, a roof that already has renewables, or a roof that cannot fit the zone is exempt. |
EV Ready | At least 20% of parking spaces wired EV-ready (40-amp Level II; shared circuits with load management allowed). |
HPWH Ready | N/A |
Paperwork & Modeling | ENERGY STAR energy model to the target (per-unit HERS or whole-building ASHRAE path), the ENERGY STAR design-review checklist and multifamily workbook, and an HVAC design report. |
Testing & Verification | ENERGY STAR field verification: pre-drywall and final inspections, unit air-tightness (blower door), duct-leakage, ventilation and exhaust airflow, and HVAC functional testing. |
Recommended Design - Common Areas
Item | Common Areas (Residential Building) |
|---|---|
Exterior Walls | ≥ R-23 cavity insulation (2x6 @ 16" o.c.), no continuous insulation. |
Below Grade Walls | N/A |
Corridor Walls | N/A |
Slab | ≥ R-15 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-15 under-slab insulation, 2 ft wide; provides a full thermal break. |
Floor Over Unconditioned Space | N/A |
Floor Over Garage | N/A |
Floor Over Podium | N/A |
Rim Joists | ≥ R-23 rim/band insulation at floor transitions. |
Roof | Sealed attic: ≥ R-30 insulation + ≥ R-30 continuous insulation. |
Windows & Glass Doors | Fixed, U ≤ 0.30, SHGC ≤ 0.38. |
Doors | Glazed entrance door, U ≤ 0.60, SHGC ≤ 0.40. |
Air Sealing | Continuous air barrier for these spaces. |
HVAC | No fossil-fuel heating equipment. |
Ductwork | Distribute conditioned air to all occupied common spaces. Ducts and air-handler units located entirely within conditioned space. Design and test to standard duct-design and duct-leakage practice. |
Duct Sealing | Per system, final test (at 25 Pa): 6 CFM per 100 sqft or 60 CFM (no return ducts) |
HVAC Grading | N/A |
Mechanical Ventilation | Conditioned corridor: 0.06 cfm/sqft. |
Local Mechanical Exhaust | Mechanical equipment rooms: exhaust ducted directly outdoors, ENERGY STAR certified fans. |
Thermostats | Individual thermostatic control in each zone, with a deadband of at least 5°F. |
DHW | Electric tank or instant hot water heater for common sinks. |
DHW Piping | Hot-water piping insulation thickness per Table C403.12.3. |
Water Fixtures | WaterSense |
Refrigerator | N/A |
Dishwasher | N/A |
Clothes Washer | N/A |
Clothes Dryer | N/A |
Stove / Oven | N/A |
Lighting | 100% LED. |
Lighting Controls | Occupant sensors in the corridor, management office, community room, and storage rooms. |
Solar Ready | Reserve at least 40 percent of the roof as a solar-ready zone, kept clear of vents and equipment and shown on the drawings. Design the roof for an extra 5 psf and leave a pathway to the electrical service. A heavily shaded roof, a roof that already has renewables, or a roof that cannot fit the zone is exempt. |
EV Ready | At least 20% of parking spaces wired EV-ready (40-amp Level II; shared circuits with load management allowed). |
HPWH Ready | N/A |
Electric Readiness | N/A |
Vestibules | Enclosed vestibule at public entrances, with self-closing doors. |
Efficiency Credits | N/A |
Paperwork & Modeling | HERS Index of 45 or less for each all-electric dwelling unit, documented at permit and at certificate of occupancy. |
Testing & Verification | Ventilation balancing per design. Duct leakage testing at rough-in and final. HVAC functional testing by FT agent (mandatory). Lighting controls testing. Air barrier inspections. |
Assembly Moisture Check
This section shows which air and vapor barriers are needed, and why.
Inputs
Item | Value |
|---|---|
Climate zone | 5A |
Indoor air | 70 F, 35% RH |
Dewpoint of that indoor air | 41 F |
Outdoor air | -2 F |
Code | 2018 IBC Section 1404.3 |
Exterior Walls
# | Layer (inside to outside) | R | Running R | Temp | Dewpoint target | Vs dewpoint |
|---|---|---|---|---|---|---|
1 | Drywall | 1.13 | 1.13 | 66.7 F | 41 F | OK |
2 | Class II vapor retarder | 0.00 | 1.13 | 66.7 F | 41 F | OK |
3 | R-23 cavity insulation with 2x6 wood studs | 23.00 | 24.13 | 0.3 F | 41 F | First below dewpoint |
4 | Wood sheathing | 0.62 | 24.75 | -1.5 F | 41 F | Below dewpoint |
5 | Air barrier | 0.00 | 24.75 | -1.5 F | 41 F | Below dewpoint |
6 | Siding / cladding | 0.17 | 24.92 | -2.0 F | 41 F | Below dewpoint |
Conclusion: Layer 3 is the first row below dewpoint. It is the cold plane we protect. Indoor moisture can turn to water if it gets there, and can eventually cause mold. It can get there two ways. It gets there through the drywall, which is why the vapor retarder is on the inside of the wall. It also gets there through holes (outlets, gaps, plates), which is why the air barrier is on the sheathing. Same at the rim.
Slab
# | Layer (inside to outside) | R | Running R | Temp | Dewpoint target | Vs dewpoint |
|---|---|---|---|---|---|---|
1 | Concrete slab | 0.50 | 0.50 | 69.4 F | 41 F | OK |
2 | Vapor retarder | 0.00 | 0.50 | 69.4 F | 41 F | OK |
3 | R-15 under slab and at the interior edge | 15.00 | 15.50 | 50.0 F | 41 F | OK |
4 | Gravel / ground | 0.00 | 15.50 | 50.0 F | 41 F | OK |
Conclusion: No row drops below dewpoint. This is not the wall problem. Indoor air is not leaking to a cold sheathing. The vapor retarder is under the slab to stop moisture coming up from the ground. The slab itself is the air barrier.
Roof (sealed attic)
# | Layer (inside to outside) | R | Running R | Temp | Dewpoint target | Vs dewpoint |
|---|---|---|---|---|---|---|
1 | Gypsum ceiling | 1.13 | 1.13 | 68.7 F | 41 F | OK |
2 | Air barrier | 0.00 | 1.13 | 68.7 F | 41 F | OK |
3 | R-30 at the underside of the deck | 30.00 | 31.13 | 33.8 F | 41 F | First below dewpoint |
4 | Roof deck | 0.62 | 31.75 | 33.1 F | 41 F | Below dewpoint |
5 | R-30 continuous insulation | 30.00 | 61.75 | -1.8 F | 41 F | Below dewpoint |
6 | Roofing | 0.17 | 61.92 | -2.0 F | 41 F | Below dewpoint |
Conclusion: Layer 3 is the first row below dewpoint. It is the cold plane we protect. Indoor moisture can turn to water if it gets there, and can eventually cause mold. It can get there through the insulation strapped under the deck, which is why the air barrier is the sealed gypsum on the room side of that insulation. The layer on the deck does not satisfy this.
Exterior Walls (Recommended Design)

Slab (Recommended Design)

Rim Joists (Recommended Design)

Roof (sealed attic) (Recommended Design)

Path Comparison
This section shows the detailed requirements and incentives for each path we compared, basically showing our work of how we determined the recommended path is the most affordable way of meeting energy code compliance.
Path Comparison - Incentives
HERS: $129,500 - $240,500
- MassSave Multifamily High Rise Program Energy Star Tier ($129,500) (Program Breakdown): You get this rebate for having your building(s) certified for the Energy Star MFNC v1.2 program. This requires pre-approval via an application to be submitted before construction starts. This rebate comes in the form of a check within 4 months of certification documentation being provided to MassSave, typically this is 4 months after construction is complete.
- DOER Alternative Energy Credits ($0 - $111,000) (Program Breakdown): This rebate is received for installing APS eligible air source heat pumps (click here for the list). There is an extensive process to get this incentive. It comes in the form of a check approximately 6-12 months after the heat pumps are installed and fully operational.
- IMPORTANT: Although an estimate is provided, this incentive can vary widely typically between $300-1,500 per heat pump. It's based on expected kWh usage of the system as well as the market value of the alternative energy credits when sold.
- Risks: Massachusetts is rewriting this program right now. The House bill would stop the state from accepting new applications on January 1, 2028, the Senate version leaves heat pumps out of that cutoff, and the two are in conference. The application needs the equipment installed and operating, so a project that will not reach that point before the deadline should treat this as upside rather than a budgeted line.
PHIUS: $302,500 - $413,500
- MassSave Passive House Pre-Certification ($55,500) : You get this rebate for having your project PHIUS pre-certified. Pre-Certification typically occurs toward the end of the pre-construction phase. This rebate comes in the form of a check within 4 months of the pre-certification paperwork being provided to MassSave.
- MassSave Passive House Certification ($222,000) : You get this rebate for having your project PHIUS certified. Certification typically occurs at the end of construction around when certificate of occupancy is received. This rebate comes in the form of a check within 4 months of the certification paperwork being provided to MassSave.
- MassSave Passive House Feasibility Study ($5,000) : You get this rebate for having a PHIUS feasibility study completed for your project & having a 1 hour charette with the design team and MassSave representative to review that study. This process must be completed before construction is complete. This rebate comes in the form of a check within 4 months of the charette taking place.
- IMPORTANT: The incentive is capped at 100% of the applicable service charge.
- MassSave Passive House Energy Model ($20,000) : You get this rebate for having a PHIUS energy model completed for your project & having a 1 hour charette with the design team and MassSave representative to review that study. This process must be completed before construction is complete. This rebate comes in the form of a check within 4 months of the 1 hour meeting taking place.
- IMPORTANT: The incentive is capped at 75% of the applicable service charge.
- DOER Alternative Energy Credits ($0 - $111,000) (Program Breakdown): This rebate is received for installing APS eligible air source heat pumps (click here for the list). There is an extensive process to get this incentive. It comes in the form of a check approximately 6-12 months after the heat pumps are installed and fully operational.
- IMPORTANT: Although an estimate is provided, this incentive can vary widely typically between $300-1,500 per heat pump. It's based on expected kWh usage of the system as well as the market value of the alternative energy credits when sold.
- Risks: Massachusetts is rewriting this program right now. The House bill would stop the state from accepting new applications on January 1, 2028, the Senate version leaves heat pumps out of that cutoff, and the two are in conference. The application needs the equipment installed and operating, so a project that will not reach that point before the deadline should treat this as upside rather than a budgeted line.
Path Comparison - Net Cost Summary
Path | Total Cost $/sf | Total Incentives $/sf | Net $/sf | OpEx Factor |
|---|---|---|---|---|
HERS | $67.15 | $2.67 | $65.65 | 1.02 |
PHIUS | $72.59 | $5.71 | $67.99 | 1.02 |
Path Comparison - Envelope
Item | Path | Detailed Specifications | Cost $/sf | Incentive $/sf | Net $/sf | OpEx |
|---|---|---|---|---|---|---|
Exterior Walls | HERS | ≥ R-23 cavity insulation (2x6 @ 16" o.c.), no continuous insulation. | $4.20 | $0.00 | $4.20 | 0.95 |
PHIUS | ≥ R-21 cavity insulation (2x6 @ 16" o.c.) with ≥ R-12.6 continuous exterior insulation. | $5.76 | $0.00 | $5.76 | 0.90 | |
Below Grade Walls | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 | |
Corridor Walls | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 | |
Slab | HERS | ≥ R-15 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-15 under-slab insulation, 2 ft wide; provides a full thermal break. | $0.08 | $0.00 | $0.08 | 0.90 |
PHIUS | ≥ R-10 perimeter insulation, 2 ft deep, at the interior face of the slab edge, plus ≥ R-10 under-slab insulation; provides a full thermal break. | $0.35 | $0.00 | $0.35 | 0.90 | |
Floor Over Unconditioned Space | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 | |
Floor Over Garage | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 | |
Floor Over Podium | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 | |
Rim Joists | HERS | ≥ R-23 rim/band insulation at floor transitions. | $0.20 | $0.00 | $0.20 | 0.95 |
PHIUS | ≥ R-34 rim/band insulation at floor transitions. | $0.27 | $0.00 | $0.27 | 0.95 | |
Roof | HERS | Sealed attic: ≥ R-30 insulation + ≥ R-30 continuous insulation. | $1.59 | $0.00 | $1.59 | 1.10 |
PHIUS | Sealed attic: ≥ R-30 insulation + ≥ R-30 continuous insulation. | $1.59 | $0.00 | $1.59 | 1.10 | |
Windows & Glass Doors | HERS | High performance, U ≤ 0.25 / SHGC ≤ 0.25. | $6.46 | $0.00 | $6.46 | 1.00 |
PHIUS | High performance, U ≤ 0.18 / SHGC ≤ 0.18. | $8.80 | $0.00 | $8.80 | 1.00 | |
Doors | HERS | Opaque door, U ≤ 0.20 (R-5.0). | $0.35 | $0.00 | $0.35 | 0.95 |
PHIUS | Opaque door, U ≤ 0.20 (R-5.0). | $0.35 | $0.00 | $0.35 | 0.95 | |
Air Sealing | HERS | ≤ 0.30 CFM50 per sq ft of shell area; tested. | $1.20 | $0.00 | $1.20 | 0.95 |
PHIUS | Whole-building blower door test at or below 0.06 CFM50 per sq ft of gross enclosure, and unit compartmentalization at ≤ 0.30 CFM50 per sq ft of shell area; tested. | $2.40 | $0.00 | $2.40 | 0.95 |
Path Comparison - Mechanical
Item | Path | Detailed Specifications | Cost $/sf | Incentive $/sf | Net $/sf | OpEx |
|---|---|---|---|---|---|---|
HVAC | HERS | Ducted air-source heat pump (as modeled); SEER2 ≥ 17; HSPF2 ≥ 10. See HVAC Design Loads. | $20.57 | $0.00 | $20.57 | 1.15 |
PHIUS | Ducted air-source heat pump (as modeled); SEER2 ≥ 17; HSPF2 ≥ 10. See HVAC Design Loads. | $20.57 | $0.00 | $20.57 | 1.15 | |
Ductwork | HERS | Supply and return ducts in conditioned space insulated to code minimum. | $6.86 | $0.00 | $6.86 | 1.00 |
PHIUS | Supply and return ducts in conditioned space insulated to code minimum. | $6.86 | $0.00 | $6.86 | 1.00 | |
Duct Sealing | HERS | ≤ greater of 80 CFM25 or 8 CFM25 per 100 sqft of conditioned floor area; tested at final. | $1.18 | $0.00 | $1.18 | 1.00 |
PHIUS | ≤ greater of 80 CFM25 or 8 CFM25 per 100 sqft of conditioned floor area; tested at final. | $1.18 | $0.00 | $1.18 | 1.00 | |
HVAC Grading | HERS | Fan Flow Test: Grade II | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | Fan Flow Test: Grade II | $0.00 | $0.00 | $0.00 | 1.00 | |
Mechanical Ventilation | HERS | In-unit ERV | $3.63 | $0.00 | $3.63 | 1.20 |
PHIUS | In-unit ERV | $3.63 | $0.00 | $3.63 | 1.20 | |
Local Mechanical Exhaust | HERS | The in-unit ERV fulfills local mechanical exhaust with 25 CFM in each bathroom and 50 CFM in the kitchen. | $1.67 | $0.00 | $1.67 | 1.05 |
PHIUS | The in-unit ERV fulfills local mechanical exhaust with 25 CFM in each bathroom and 50 CFM in the kitchen. | $1.67 | $0.00 | $1.67 | 1.05 | |
Thermostats | HERS | Programmable thermostat (as modeled). | $0.20 | $0.00 | $0.20 | 1.05 |
PHIUS | Programmable thermostat (as modeled). | $0.20 | $0.00 | $0.20 | 1.05 |
Path Comparison - Plumbing & Appliances
Item | Path | Detailed Specifications | Cost $/sf | Incentive $/sf | Net $/sf | OpEx |
|---|---|---|---|---|---|---|
DHW | HERS | 1-Bedroom: Heat pump water heater (HPWH) (as modeled); UEF ≥ 3.88; 40 gal | $3.72 | $0.00 | $3.72 | 1.20 |
PHIUS | 1-Bedroom: Heat pump water heater (HPWH) (as modeled); UEF ≥ 3.88; 40 gal | $3.72 | $0.00 | $3.72 | 1.20 | |
DHW Piping | HERS | Supply piping insulated to ≥ R-3. | $1.18 | $0.00 | $1.18 | 0.95 |
PHIUS | Supply piping insulated to ≥ R-3. | $1.18 | $0.00 | $1.18 | 0.95 | |
Water Fixtures | HERS | WaterSense certified (Lavatory ≤ 1.2 GPM; Shower ≤ 2.0 GPM; Kitchen ≤ 2.2 GPM). | $2.94 | $0.00 | $2.94 | 1.00 |
PHIUS | WaterSense certified (Lavatory ≤ 1.2 GPM; Shower ≤ 2.0 GPM; Kitchen ≤ 2.2 GPM). | $2.94 | $0.00 | $2.94 | 1.00 | |
Refrigerator | HERS | ≤ 600 kWh/yr; electric. | $1.24 | $0.00 | $1.24 | 1.10 |
PHIUS | ≤ 600 kWh/yr; electric. | $1.24 | $0.00 | $1.24 | 1.10 | |
Dishwasher | HERS | ≤ 269 kWh/yr; electric. | $0.69 | $0.00 | $0.69 | 1.10 |
PHIUS | ≤ 269 kWh/yr; electric. | $0.69 | $0.00 | $0.69 | 1.10 | |
Clothes Washer | HERS | IMEF ≥ 2.06; IWF ≤ 4.2; ≤ 152 kWh/yr; electric. | $0.78 | $0.00 | $0.78 | 1.10 |
PHIUS | IMEF ≥ 2.06; IWF ≤ 4.2; ≤ 152 kWh/yr; electric. | $0.78 | $0.00 | $0.78 | 1.10 | |
Clothes Dryer | HERS | Heat pump dryer; ventless; CEF ≥ 6. | $1.61 | $0.00 | $1.61 | 1.00 |
PHIUS | Heat pump dryer; ventless; CEF ≥ 6. | $1.61 | $0.00 | $1.61 | 1.00 | |
Stove / Oven | HERS | Electric induction cooktop; convection oven. | $1.27 | $0.00 | $1.27 | 1.05 |
PHIUS | Electric induction cooktop; convection oven. | $1.27 | $0.00 | $1.27 | 1.05 |
Path Comparison - Electrical
Item | Path | Detailed Specifications | Cost $/sf | Incentive $/sf | Net $/sf | OpEx |
|---|---|---|---|---|---|---|
Lighting | HERS | ≥ 100% high-efficacy (LED). | $4.00 | $0.00 | $4.00 | 0.85 |
PHIUS | ≥ 100% high-efficacy (LED). | $4.00 | $0.00 | $4.00 | 0.85 | |
Solar Ready | HERS | Reserve at least 40 percent of the roof as a solar-ready zone, kept clear of vents and equipment and shown on the drawings. Design the roof for an extra 5 psf and leave a pathway to the electrical service. A heavily shaded roof, a roof that already has renewables, or a roof that cannot fit the zone is exempt. | $0.30 | $0.00 | $0.30 | 1.00 |
PHIUS | Reserve at least 40 percent of the roof as a solar-ready zone, kept clear of vents and equipment and shown on the drawings. Design the roof for an extra 5 psf and leave a pathway to the electrical service. A heavily shaded roof, a roof that already has renewables, or a roof that cannot fit the zone is exempt. | $0.30 | $0.00 | $0.30 | 1.00 | |
EV Ready | HERS | At least 20% of parking spaces wired EV-ready (40-amp Level II; shared circuits with load management allowed). | $0.60 | $0.00 | $0.60 | 1.00 |
PHIUS | At least 20% of parking spaces wired EV-ready (40-amp Level II; shared circuits with load management allowed). | $0.60 | $0.00 | $0.60 | 1.00 | |
HPWH Ready | HERS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
PHIUS | N/A | $0.00 | $0.00 | $0.00 | 1.00 |
Path Comparison - Soft Costs & Whole-Building Incentives
Item | Path | Detailed Specifications | Cost $/sf | Incentive $/sf | Net $/sf | OpEx |
|---|---|---|---|---|---|---|
Paperwork & Modeling | HERS | ENERGY STAR energy model to the target (per-unit HERS or whole-building ASHRAE path), the ENERGY STAR design-review checklist and multifamily workbook, and an HVAC design report. | $0.19 | $2.67 | -$2.48 | 1.00 |
PHIUS | Register the project with Phius and carry a WUFI Passive v3.5 model through design review to a Phius Design Certification letter before construction. The design submission includes the drawings, the Phius 2024 criteria calculator, fenestration and equipment datasheets, and a letter of intent from the Phius Rater or Verifier. Update the WUFI Passive model to as-built conditions for final certification. ENERGY STAR energy model to the target (per-unit HERS or whole-building ASHRAE path), the ENERGY STAR design-review checklist and multifamily workbook, and an HVAC design report. | $0.19 | $5.71 | -$5.52 | 1.00 | |
Testing & Verification | HERS | ENERGY STAR field verification: pre-drywall and final inspections, unit air-tightness (blower door), duct-leakage, ventilation and exhaust airflow, and HVAC functional testing. | $0.44 | $0.00 | $0.44 | 1.00 |
PHIUS | Phius field verification includes mid-construction inspections, a whole-building blower door test at or below 0.06 CFM50 per sq ft of gross enclosure, dwelling-unit compartmentalization at or below 0.30 CFM50 per sq ft of enclosure, and ventilation airflow testing and balancing. Update the WUFI Passive model to the tested blower door result. ENERGY STAR field verification: pre-drywall and final inspections, unit air-tightness (blower door), duct-leakage, ventilation and exhaust airflow, and HVAC functional testing. | $0.44 | $0.00 | $0.44 | 1.00 |
Additional Design Considerations Not Represented In This Study
- N/A