Cedar Park TX Energy Code Multifamily: 2021 IECC Since June 2022, No Technical Energy Amendments, and When to Study First

Cedar Park, TX energy code for multifamily: the 2021 IECC under Ordinance CO16.22.02.24.E1 (effective June 1, 2022), administrative-only local amendments, climate zone 2A, the residential vs commercial split, and when to study first.

November 27, 2026

If you are building multifamily inside the City of Cedar Park, Texas, you are on the 2021 International Energy Conservation Code, in effect since June 1, 2022. The City Council adopted the 2021 International Codes by Ordinance CO16.22.02.24.E1, read on first reading on February 10, 2022 and passed on second and final reading on February 24, 2022. The local energy amendments are administrative only: the City renamed the code, pointed fees and appeals to its own ordinances, and fixed the climate zone at 2A. That puts Cedar Park with Dallas, Arlington, Denton, Grand Prairie, Houston, San Antonio, El Paso, New Braunfels, Georgetown, and Lewisville on the 2021 IECC, while nearby Austin and Round Rock, plus Plano, McKinney, Frisco, Allen, Irving, and College Station, are on the 2024 edition. Teams that file in Austin or Round Rock and then pick up a Cedar Park site are working one code cycle back.

This page is the Cedar Park Energy Code door for multifamily developers. For the statewide Texas commercial code path (the 2015 IECC floor, ASHRAE pairings, and why mid-rise is not HERS-first), see ASHRAE COMcheck Texas multifamily. For the Texas study door, see energy code feasibility study Texas. Other Texas city doors already live: Houston Energy Code multifamily, Austin Energy Code multifamily, Dallas Energy Code multifamily, San Antonio Energy Code multifamily, Fort Worth Energy Code multifamily, El Paso Energy Code multifamily, Corpus Christi Energy Code multifamily, Arlington Energy Code multifamily, Plano Energy Code multifamily, McKinney Energy Code multifamily, Frisco Energy Code multifamily, Denton Energy Code multifamily, Irving Energy Code multifamily, Grand Prairie Energy Code multifamily, College Station Energy Code multifamily, Round Rock Energy Code multifamily, New Braunfels Energy Code multifamily, Georgetown Energy Code multifamily, Allen Energy Code multifamily, and Lewisville Energy Code multifamily. Program, testing, and modeling context: ENERGY STAR Multifamily New Construction, blower door testing for multifamily buildings, and multifamily energy modeling.

What Code Applies in Cedar Park Right Now

Per the City of Cedar Park and its Code of Ordinances (primary sources; confirm with the City before you file):

  • The City's Building Permits and Inspections page lists the adopted building codes, effective June 1, 2022, as the 2021 IBC, IRC, IFC, IPC, IMC, IFGC, IEBC, IECC, IPMC, and Pool and Spa Code, plus the 2020 National Electrical Code, each including local amendments in Chapter 3 (Building Regulations) and Chapter 5 (Fire and Emergency Management) of the City Code.
  • Ordinance CO16.22.02.24.E1 amends Chapter 3, Section 3.01.001 (Building Codes Adopted) to adopt the 2021 International Codes with local amendments. Section 2 of the ordinance sets the effective date at June 1, 2022, and the Council passed it on second and final reading on February 24, 2022.
  • In the City's Code of Ordinances, Article 3.01, Section 3.01.001 adopts the 2021 IECC as the energy conservation code of the City. The adopting text says it applies within the corporate limits and within the City's extraterritorial jurisdiction. The history note cites the 2022 ordinance and an earlier 2018 ordinance.
  • No 2024 adoption found. As of this writing, the City's adopted code list and its Code of Ordinances still show the 2021 IECC, and we found no 2024 I-Code adoption ordinance. Ask the Building Official whether an update is coming before you lock a long schedule.

Cedar Park sits in Williamson County, with part of the city in Travis County. Both counties are listed as climate zone 2A (warm, humid) in the 2021 IECC county table, and the City's own amendment fixes the zone at 2A. That is the same zone as Austin, Round Rock, Georgetown, Houston, and San Antonio. A climate zone 3A package from Lewisville, Allen, or Plano is the wrong zone, so rerun it rather than copy it.

What Cedar Park Changes (and Does Not Change) in the 2021 IECC

The energy amendments in Section 3.01.001 are short and administrative:

  • Jurisdiction name (C101.1 and R101.1). The code is cited as the International Energy Conservation Code of the City of Cedar Park, Texas.
  • Permit fees (C104.2 and R104.2). The model text is replaced with a pointer to Appendix A, Article 2.000 of the City Code of Ordinances. We do not quote a fee here; use the City's current schedule.
  • Appeals (C110 and R110). The model text is replaced with a pointer to Chapter 3, Section 3.01.004 of the City Code, which the City Code identifies as establishing the Building and Standards Commission.
  • Climate zone (C301.1 and R301.1). For purposes of the code, the applicable climate zone is 2A with a warm/humid designation.

That is the whole list. There is no NCTCOG-style regional amendment package like Lewisville's, no replaced performance path, no dated ERI schedule, no local unit testing sample, and no Georgetown-style total UA rule. The 2021 IECC applies as published, including its air leakage, duct, and ventilation testing provisions, the R401.2.5 additional efficiency requirement on the residential side, and the C406 additional efficiency credits on the commercial side. Read those sections in the 2021 IECC itself and confirm how the Building Official applies them.

Residential vs Commercial Split for Multifamily

Cedar Park did not amend the scope, so the 2021 IECC draws the line as published: Group R-2, R-3, and R-4 buildings three stories or less above grade plane fall under the residential provisions. Taller apartment buildings, and the nonresidential portions of any building, fall under the commercial provisions, where the 2021 IECC commercial chapter or its ASHRAE 90.1-2019 alternative applies. Per ECC's Austin page, Austin moves that line to four stories or less with a local amendment. Cedar Park does not, so a four-story building that files as residential in Austin files as commercial in Cedar Park.

  • Garden-style and townhome projects. Three stories or less usually lands on the residential provisions. Compare prescriptive, performance, and ERI early, and price the R401.2.5 additional efficiency option and the testing program with the envelope, not after plan review.
  • Mid-rise, podium, and mixed-use projects. Four stories and up, plus retail, amenity, lobby, corridor, and parking areas, follow commercial documentation, usually a COMcheck or an ASHRAE 90.1-2019 model, with the C406 credits picked early.

Proof From ECC Studies (Method, Not Cedar Park Invoices)

ECC does not publish a Cedar Park or Texas dollar-per-square-foot average, and we do not have a Cedar Park energy-code invoice to present as your number. We cite other studies as proof of method, and we label them that way.

On our 267-unit Cromwell, CT study (CS68), two buildings up to six stories (272,036 square feet) were filed on IECC commercial provisions using ASHRAE 90.1-2019 Appendix G. The recommended all-electric tier came in at about $35.23 per square foot net and captured a $1,500 per unit Energize CT incentive ($400,500). Those are Connecticut outcomes, not Cedar Park invoices. They show the order: lock the path and edition, rank the packages, then document the winner.

On a 112-unit Revere, MA study (CS57), a seven-story mixed-use building kept dwelling units on a Massachusetts Stretch HERS path and still called for a COMcheck report for all common and support areas, plus ASHRAE 62.1 ventilation calculations and lighting power density calculations. The recommended ductless package landed at about $42.52 per square foot net. Those are Massachusetts outcomes. We cite them as proof that mixed-use paperwork splits before modeling hours, not as a Cedar Park price.

Common Mistakes on Cedar Park Multifamily Energy Filings

  • Copying an Austin or Round Rock package. Both cities are on the 2024 IECC, and Austin carries its own local amendments. Cedar Park is on the 2021 IECC with administrative changes only.
  • Copying a North Texas 2021 package. Lewisville and Denton share the edition, but they sit in climate zone 3A and carry regional amendments Cedar Park never adopted.
  • Treating a four-story building as residential. That works in Austin under its local amendment. In Cedar Park, four stories puts Group R-2 on the commercial provisions.
  • Pairing the wrong ASHRAE year. The 2021 IECC commercial alternative is ASHRAE 90.1-2019, not 90.1-2022.
  • Assuming testing or credits were amended away. Cedar Park adopted no testing exceptions and did not delete R401.2.5 or the C406 credits. Plan for them.
  • Buying COMcheck or REScheck hours before the path is locked. The study should settle residential vs commercial, the compliance path, the credits, and the testing plan, then the paperwork follows.

When to Study First

Settle the Cedar Park path before anyone buys REScheck, COMcheck, ERI, or whole-building modeling hours:

  1. Confirm the permit address is inside the City of Cedar Park (not Austin, Leander, Round Rock, or unincorporated Williamson or Travis County), and if the site is in the extraterritorial jurisdiction, ask the Building Official how the City reviews it
  2. Confirm the 2021 IECC is still the adopted edition on the date your application will be received
  3. Lock the residential vs commercial split (three stories or less for Group R-2 / R-3 / R-4 on the residential provisions, and commercial documentation for nonresidential areas)
  4. For residential-scope buildings, compare prescriptive, performance, and ERI, including the R401.2.5 additional efficiency option
  5. For each commercial portion, pick 2021 IECC commercial or ASHRAE 90.1-2019, choose the C406 credits, and model envelope, window, ventilation, and HVAC packages side by side for climate zone 2A
  6. Produce the compliance reports, performance models, and test records against the locked plan

That comparison is what a free feasibility study produces. For the Texas study method, see energy code feasibility study Texas. For how modeling works on apartment buildings in general, see multifamily energy modeling. If the path is already chosen and you need COMchecks, modeling, inspections, or testing, see ECC services.

Bottom Line

The Cedar Park energy code for multifamily is the 2021 IECC, adopted in City Code Section 3.01.001 by Ordinance CO16.22.02.24.E1 on February 24, 2022 and in effect since June 1, 2022. The local energy amendments only rename the code, point fees and appeals to City ordinances, and fix the climate zone at 2A, so the model code applies as written, with the three-story residential limit, the testing provisions, the R401.2.5 requirement, and the C406 credits intact. Nearby Austin and Round Rock are on the 2024 IECC. This is the Cedar Park city-code door, not the statewide Texas code-path page, not the other Texas city doors, and not the Texas study door. Lock the edition, the split, and the compliance path first, then buy the paperwork that matches the plan.