Round Rock TX Energy Code Multifamily: 2024 IECC, No Local Energy Amendments, and When to Study First

Round Rock, TX energy code for multifamily: the 2024 IECC without appendices, in effect January 1, 2026 under Ordinance O-2025-335, the jump from the 2015 IECC, COMcheck, climate zone 2A, and when to study first.

November 16, 2026

If you are building multifamily inside the City of Round Rock, Texas, you are on the 2024 International Energy Conservation Code, in effect since January 1, 2026. The City Council adopted the 2024 codes by Ordinance O-2025-335 on December 18, 2025, and the energy code it replaced was the 2015 IECC. That is a jump of three code cycles in one step, skipping the 2018 and 2021 editions entirely. It puts Round Rock with Austin, Irving, Frisco, Plano, McKinney, and College Station on the 2024 IECC, while Dallas, Arlington, Denton, Grand Prairie, Houston, and San Antonio are still on the 2021 edition. Round Rock sits just north of Austin, and many teams assume the two cities file the same way. They do not: Austin carries a long list of local energy amendments, and Round Rock adopted the 2024 IECC almost as published.

This page is the Round Rock Energy Code door for multifamily developers. For the statewide Texas commercial code path (the 2015 IECC floor, ASHRAE pairings, and why mid-rise is not HERS-first), see ASHRAE COMcheck Texas multifamily. For the Texas study door, see energy code feasibility study Texas. Other Texas city doors already live: Houston Energy Code multifamily, Austin Energy Code multifamily, Dallas Energy Code multifamily, San Antonio Energy Code multifamily, Fort Worth Energy Code multifamily, El Paso Energy Code multifamily, Corpus Christi Energy Code multifamily, Arlington Energy Code multifamily, Plano Energy Code multifamily, McKinney Energy Code multifamily, Frisco Energy Code multifamily, Denton Energy Code multifamily, Irving Energy Code multifamily, Grand Prairie Energy Code multifamily, and College Station Energy Code multifamily. Program, testing, and modeling context: ENERGY STAR Multifamily New Construction, blower door testing for multifamily buildings, and multifamily energy modeling.

What Code Applies in Round Rock Right Now

Per the City of Round Rock Building Inspection Division page and the City's adopting ordinance (primary sources; confirm with the City before you file):

  • The City's currently adopted codes list the 2024 IBC, IFC, IECC, IRC, ISPSC, IMC, and IPC, the 2023 National Electrical Code, and the Texas Accessibility Standards.
  • Ordinance O-2025-335 adopts the 2024 editions of the IMC, IFGC, IPC, IECC, IBC, IEBC, IRC, ISPSC, and the International Green Construction Code. The Planning and Zoning Commission recommended approval on November 19, 2025, and the City Council approved the ordinance on December 18, 2025, dispensing with a second reading. The ordinance takes effect from and after January 1, 2026.
  • In Chapter 8, Article X of the Code of Ordinances, Section 8-116 now adopts the 2024 IECC, excluding all appendices, where it previously adopted the 2015 edition. Section 8-117 carries the amendments.
  • The City's new commercial construction checklist asks for a 2024 COMcheck with the permit set, and the new residential checklist asks for a 2024 REScheck-style energy report. Plan the energy documents with the drawings, not after plan review comments.

Round Rock is in Williamson County (with a portion in Travis County), climate zone 2A (hot, humid), the same zone as Austin, Houston, San Antonio, and College Station, and one zone warmer than Dallas-Fort Worth. A climate zone 3A package from Irving, Frisco, or Plano is on the same edition but the wrong zone, so rerun it rather than copy it.

What Round Rock Changes (and Does Not Change) in the 2024 IECC

Section 8-117 is short. The energy amendments in the ordinance are administrative only:

  • Jurisdiction name (C101.1 and R101.1). "City of Round Rock, Texas" is inserted in both the commercial and residential provisions.
  • Penalties (C108.4 and R108.4). Violations carry a fine of not less than $1.00 or more than $2,000.00. That is the City's penalty range, not a compliance cost.
  • No appendices. The ordinance adopts the 2024 IECC excluding all appendices, so the optional appendix provisions do not apply unless the City adopts them later. Austin, by contrast, adopted renewable energy and EV readiness provisions with its 2024 code.

That is the whole list. There are no local testing exceptions like College Station's, no regional NCTCOG-style amendments like the DFW cities, no replaced performance path, and no deleted R408 credits. The model code applies as written, including its air leakage testing, duct testing, and additional efficiency credit requirements. For teams that last filed in Round Rock under the 2015 IECC, nearly every prescriptive table, testing rule, and credit requirement has moved.

The same ordinance also adds the 2024 International Green Construction Code as Section 8-154, with only the jurisdiction name amended. The City's Building Inspection page does not list it among the currently adopted codes, so ask the Building Inspection Division early whether and how it applies to your project.

Residential vs Commercial Split for Multifamily

Because Round Rock did not amend the scope, the 2024 IECC draws the line as published: Group R-2, R-3, and R-4 buildings three stories or less above grade plane fall under the residential provisions. Taller apartment buildings, and the nonresidential portions of any building, fall under the commercial provisions, where the 2024 IECC commercial chapter or its ASHRAE 90.1-2022 alternative applies. Austin moves that line to four stories or less with a local amendment. Round Rock does not, so a four-story building that is residential in Austin is commercial in Round Rock.

  • Mid-rise, podium, and mixed-use projects. Retail, amenity, lobby, corridor, and parking areas follow commercial documentation, and the City asks for a 2024 COMcheck. Dwelling units still face the commercial air leakage testing rules, so price the blower door program with the envelope, not after it.
  • Garden-style and townhome projects. Three stories or less usually lands on the residential provisions, where air and duct testing, the R408 additional efficiency credits, and the choice between prescriptive, performance, and ERI paths decide which package is cheapest.

Proof From ECC Studies (Method, Not Round Rock Invoices)

ECC does not publish a Round Rock or Texas dollar-per-square-foot average, and we do not have a Round Rock energy-code invoice to present as your number. We cite other studies as proof of method, and we label them that way.

On our 267-unit Cromwell, CT study (CS68), two buildings up to six stories (272,036 square feet) were filed on IECC commercial provisions using ASHRAE 90.1-2019 Appendix G. The recommended all-electric tier came in at about $35.23 per square foot net and captured a $1,500 per unit Energize CT incentive ($400,500). Those are Connecticut outcomes on an earlier ASHRAE year, not Round Rock invoices. They show the order: lock the path and edition, rank the packages, then document the winner.

On a 112-unit Revere, MA study (CS57), a seven-story mixed-use building kept dwelling units on a Massachusetts Stretch HERS path and still called for a COMcheck report for all common and support areas, plus ASHRAE 62.1 ventilation calculations and lighting power density calculations. The recommended ductless package landed at about $42.52 per square foot net. Those are Massachusetts outcomes. We cite them as proof that mixed-use paperwork splits before modeling hours, not as a Round Rock price.

Common Mistakes on Round Rock Multifamily Energy Filings

  • Reusing a 2015 IECC package. Round Rock enforced the 2015 IECC until the 2024 codes took effect on January 1, 2026. A package or REScheck built for the old code needs to be redone, not touched up.
  • Copying an Austin package. Austin and Round Rock are both on the 2024 IECC in climate zone 2A, but Austin's local amendments change the residential height limit, add renewable and EV provisions, and amend the ASHRAE path. Round Rock adopted the model code with administrative changes only.
  • Copying a DFW 2024 package. Irving, Frisco, Plano, and McKinney are on the same edition but in climate zone 3A with regional and local amendments. Round Rock is climate zone 2A.
  • Pairing the wrong ASHRAE year. The 2024 IECC commercial alternative is ASHRAE 90.1-2022, not 90.1-2019.
  • Assuming testing was amended away. Unlike College Station, Round Rock adopted no field verification exceptions, so plan for the air leakage and duct testing the 2024 IECC requires.
  • Buying COMcheck or ERI hours before the path is locked. The study should settle residential vs commercial, 2024 IECC vs ASHRAE 90.1-2022 for commercial areas, the testing plan, and the R408 credits, then the paperwork follows.

When to Study First

Settle the Round Rock path before anyone buys REScheck, COMcheck, ERI, or whole-building modeling hours:

  1. Confirm the permit address is inside the City of Round Rock (not Austin, Georgetown, Pflugerville, the ETJ, or unincorporated Williamson County) and on the 2024 IECC under Section 8-116 for your filing date
  2. Lock the residential vs commercial split (three stories or less for Group R-2 / R-3 / R-4 on the residential provisions, and commercial documentation for nonresidential areas)
  3. For each commercial portion, pick 2024 IECC commercial or ASHRAE 90.1-2022, and plan the 2024 COMcheck the City asks for
  4. Ask the Building Inspection Division whether the 2024 International Green Construction Code adopted in the same ordinance will apply to your project
  5. Model envelope, window, ventilation, and HVAC packages side by side for climate zone 2A, including the R408 credits, and compare the prescriptive, performance, and ERI paths
  6. Produce the COMcheck reports, performance models, and test records against the locked plan

That comparison is what a free feasibility study produces. For the Texas study method, see energy code feasibility study Texas. For how modeling works on apartment buildings in general, see multifamily energy modeling. If the path is already chosen and you need COMchecks, modeling, inspections, or testing, see ECC services.

Bottom Line

The Round Rock energy code for multifamily is the 2024 IECC, excluding all appendices, adopted by Ordinance O-2025-335 on December 18, 2025 and in effect January 1, 2026, replacing the 2015 IECC. Section 8-117 changes only the jurisdiction name and the penalty range, so the model code applies as written in climate zone 2A, with the three-story residential limit, the testing rules, and the R408 credits intact, and the City asks for a 2024 COMcheck on commercial and multifamily permits. This is the Round Rock city-code door, not the statewide Texas code-path page, not the other Texas city doors, and not the Texas study door. Lock the split, the edition, and the testing plan first, then buy the paperwork that matches the plan.